Fuel injection shaft

Time: 2021-08-23Source:


Service Content:
1. Intelligent manufacturing unit: planning, design, manufacturing, installation and commissioning;
2. Automated production line: planning, design, manufacturing, installation and adjustment;
3. Optimization of production line rhythm;
4. Process optimization: tool optimization, fixture optimization, program optimization;
5. Training;
Effect conclusion:
This project system includes one vertical machining center, one CNC lathe, articulated robotic arm, one set of loading and unloading logistics lines, and other hardware to achieve automated production and processing.
Implementation cycle:
4 weeks.